Jump to content

Sounder commuter rail

Route map:
From Wikipedia, the free encyclopedia

Sounder
Two Sounder trainsets at Tukwila station
Two Sounder trainsets at Tukwila station
Overview
OwnerSound Transit
LocaleSeattle metropolitan area
Transit typeCommuter rail
Number of lines2
Number of stations12
Daily ridership6,715 (2023)[1]
Annual ridership1,755,751 (2023)[1]
Websitesoundtransit.org
Operation
Began operationSeptember 18, 2000 (2000-09-18)
Operator(s)BNSF Railway
Reporting marksSDRX[2]
Number of vehicles14 locomotives, 78 cars[1]
Train length2–7 passenger cars[1]
Technical
System length81.8 miles (131.6 km)[1]
Track gauge4 ft 8+12 in (1,435 mm) (standard gauge)
Top speed79 mph (127 km/h)

Sounder (reporting mark SDRX)[2] is a commuter rail system that serves the Seattle metropolitan area in the U.S. state of Washington. It is managed by Sound Transit and operated by BNSF Railway on 82 miles (132 km) of tracks, primarily owned by BNSF, using equipment maintained by Amtrak. Sounder is split into two lines that intersect at King Street Station in Seattle: the N Line to Everett and the S Line to Tacoma and Lakewood.

Sounder trains typically operate during peak periods, with trains to Seattle in the morning and to outlying areas in the afternoon. Limited midday service is offered on the S Line and special weekend trips are run on both lines for sporting events and major events. In 2023, the system had a ridership of 1,630,000,[3] or about 7,300 per weekday as of the third quarter of 2024.[4]

The commuter rail system was preceded by mainline passenger railroad service that began in the late 19th century, including two interurban railways to Everett and Tacoma that operated until the 1920s. After a decade of planning, Sounder commuter rail service was approved by voters in a 1996 ballot measure and construction on its stations began in 1998. The South Line (now the S Line) entered service on September 18, 2000, and was followed by the North Line (now the N Line) on December 26, 2003. The South Line was extended from Tacoma to Lakewood in October 2012 and is planned to be extended further to DuPont by 2045.

Lines

[edit]

The Sounder commuter rail system comprises two lines that total 81.8 miles (131.6 km) in length and serve twelve stations.[1][5] King Street Station in Downtown Seattle serves as the system's central hub and is the terminus of both lines. The N Line serves three stations and terminates in Everett; the S Line serves eight stations and terminates in Lakewood, with some trips ending in Tacoma.[5] The two lines carried a total of 1.8 million passengers in 2023 and Sounder was the 13th-busiest commuter rail system in the United States by ridership.[1][6]

Train service is primarily operated during weekday rush hours, with trips inbound to Seattle during the morning and outbound to the suburbs in the afternoon. Other services, including reverse commute and mid-day trips are offered on the S Line, while both lines have occasional weekend service for special events.[7][8] Most of the Sounder system uses tracks owned by BNSF Railway, which is also contracted to operate the trains. Amtrak provides fleet maintenance and storage of trains at their Seattle facility.[5][9] The Lakewood–Tacoma segment of the S Line, part of the Point Defiance Bypass, uses tracks that are owned by Sound Transit.[10][11]

N Line

[edit]

Map

The N Line begins in Seattle and travels north for 34.2 miles (55.0 km) on the BNSF Scenic Subdivision towards Snohomish County, where it serves three stations and terminates in Everett.[12][13] It typically uses short trainsets with two or three passenger cars during its normal four round-trips on weekdays; for special event services, the N Line has five-car trainsets.[1] Trains leave King Street Station and cross beneath Downtown Seattle in the Great Northern Tunnel, which was completed in 1904 and was the highest and widest railroad tunnel in the U.S. at the time.[14] The tracks emerge under Pike Place Market and travel through four at-grade crossings along Alaskan Way on the city's waterfront.[15] The N Line continues northwest past Myrtle Edwards Park and under the Magnolia Bridge to traverse the Balmer Yard, a major BNSF railyard in the Interbay neighborhood.[16][17]

The tracks cross over the Lake Washington Ship Canal on the Salmon Bay Bridge, a movable bascule bridge near the Ballard Locks, and pass through Golden Gardens Park.[18][19] The N Line continues north along the shore of Puget Sound and passes under overpasses at Carkeek Park in Seattle and Richmond Beach in Shoreline.[16][19] The coastline tracks run under steep bluffs to the east that range from 80 to 100 feet (24 to 30 m) in height and are prone to landslides during the winter season.[13][20] The line enters Snohomish County at Woodway and turns northeast at Edwards Point to reach the Edmonds waterfront. Its first outbound station is Edmonds station, located adjacent to the city's ferry terminal and downtown.[16][21]

The N Line continues north along Puget Sound until it reaches Mukilteo Lighthouse Park, where the tracks turn east and cross under State Route 525. Trains then stop at Mukilteo station, a two-platform station near a ferry terminal that serves the Whidbey Island ferry.[22][23] The tracks continue northeast along Possession Sound and pass several public beaches before they reach Everett.[16][24] The N Line travels east under Downtown Everett in a short tunnel and turns south to reach its terminus at Everett Station, a multimodal hub with bus and Amtrak connections.[16][25] Trains take approximately 53 minutes to travel from Seattle to Everett and have views of Puget Sound, the Olympic Mountains, and Mount Baker.[26][27]

S Line

[edit]

Map

The S Line is 47.6 miles (76.6 km) long and travels south along the State Route 167 corridor from Seattle to Pierce County, where trips terminate in either Tacoma or Lakewood.[12] It follows portions of the BNSF Seattle Subdivision from Seattle to Tacoma, a Tacoma Rail spur, and Sound Transit's Lakewood Subdivision from Tacoma to Lakewood.[13] The S Line uses longer trainsets in five-car and seven-car configurations and has 13 round trips on weekdays—including reverse direction trips and limited mid-day service.[1][28] Trains begin at King Street Station and travel south along the east side of Lumen Field and T-Mobile Park, passing under the retractable roof of the latter, in the industrial SoDo neighborhood.[29] The tracks pass the Sounder and Amtrak maintenance facility near South Holgate Street and continue under the Spokane Street Viaduct;[30] they then turn southeast at Union Pacific's Argo Yard.[31][32]

The line travels southeast through Georgetown and runs between Boeing Field to the west and Interstate 5 to the east.[13] The S Line crosses under the tracks for the 1 Line of the Link light rail system near South Boeing Access Road and continues into Tukwila.[33] The tracks cross under Interstate 5 and begin to follow the Duwamish River and later the Green River near Fort Dent Park and the Starfire Sports complex.[16] Trains then pass under Interstate 405 near the former Longacres horse racing track and arrive at the first outbound station, Tukwila, which is shared with Amtrak Cascades.[34] The S Line continues south through the industrial Green River Valley into Kent, where it crosses under State Route 167 and stops at Kent station.[16][31] The tracks traverse eight at-grade crossings in Kent before crossing the Green River at the city's southern boundary.[35]

The S Line passes Auburn Municipal Airport and the Emerald Downs horse racing track in northern Auburn. It then stops to serve Auburn station in the city's downtown near an interchange with State Route 18.[16] Trains pass through a large railyard and cross over the White River before leaving King County to enter Pierce County near Pacific.[16] The tracks turn southwest in Sumner and serve the city's train station near its downtown. The S Line cross under State Route 410 and over the Puyallup River before it turns northwest to enter Puyallup.[13] The line crosses under State Route 512 and stops at Puyallup station near the Washington State Fairgrounds; it also traverses a series of at-grade crossings in the city.[31][36]

The tracks continue northwest to follow the Puyallup River and make a series of turns along the western edge of the rural valley as it approaches Tacoma. The S Line crosses under State Route 167 and Interstate 5 and leaves the BNSF Seattle Subdivision to travel on a section of Tacoma Rail that includes a 1,500-foot (460 m) trestle.[37][38] The S Line reaches Tacoma Dome Station, a major intermodal hub near the Tacoma Dome with connections to the T Line streetcar, buses, and Amtrak trains.[22] The line moves to the Sound Transit-owned Lakewood Subdivision on a single track that crosses west under Interstate 705 and State Route 16 as it traverses a grade of 2.85 percent—among the steepest of any passenger railway in the United States.[31][39] The S Line curves south and passes through South Tacoma station before it enters the city of Lakewood. The tracks pass an auxiliary railyard for Sounder trains and turn southwest near McChord Field to reach the southern terminus of the S Line at Lakewood station.[31][40] S Line trains from Seattle to Tacoma Dome Station take a scheduled 62 minutes, while Seattle to Lakewood is approximately 76 minutes.[9]

Stations

[edit]

The Sounder commuter rail system has 12 stations that are spaced several miles apart to allow for faster average speeds. Each station has at least one platform that is 500 to 600 feet (150 to 180 m) long and can accommodate a seven-car trainset.[9][41] The platforms include shelters, ticket vending machines, ORCA card readers, and a raised "mini-high" platform for level boarding onto trains; the raised portion is setback from the tracks to accommodate wider freight train clearances.[9] The edge of the platform is marked with tactile paving and "welcome mats" that mark where train doors are expected to open.[42] The latter is part of Sound Transit's public art program, which also encompasses sculptures and design elements at stations.[42]

Several stations are shared with intercity Amtrak trains or are adjacent to Washington State Ferries terminals;[43] all 12 stations have facilities for local and regional buses that connect with Sounder trains.[9][44] Most stations also have park and ride lots, with over 1,200 stalls on the N Line and 6,200 stalls on the S Line,[9][24] and bicycle lockers.[45] Sounder stations are generally at street level and several have bridges for pedestrian crossings that separate them from train traffic.[9][23]

Sounder stations
Station County Began service Transfers and connections[43][44]
Lakewood Pierce October 8, 2012
South Tacoma October 8, 2012
Tacoma Dome September 18, 2000 Link light rail Link light rail: T Line
Amtrak Amtrak: Cascades, Coast Starlight
Puyallup February 5, 2001
Sumner September 18, 2000
Auburn King September 18, 2000
Kent February 5, 2001
Tukwila March 12, 2001 Amtrak Amtrak: Cascades
King Street–Seattle September 18, 2000 Link light rail Link light rail: 1 Line
Amtrak Amtrak: Cascades, Coast Starlight, Empire Builder
Edmonds Snohomish December 23, 2003 Amtrak Amtrak: Cascades, Empire Builder
ferry/water interchange Washington State Ferries
Mukilteo May 31, 2008 ferry/water interchange Washington State Ferries
Everett December 23, 2003 Amtrak Amtrak: Cascades, Empire Builder

History

[edit]

S Line

[edit]

The S Line (formerly the South Line) began service with two round trip trains on September 18, 2000, with stops in Tacoma, Sumner and Auburn that terminated in Seattle. Puyallup and Kent stations were added February 5, 2001, with Tukwila being added March 12, 2001. There are currently thirteen round trips on the S Line, with three operating in the reverse commute direction.[46]

In July 2010, Sound Transit reached a new agreement with BNSF, valued at $185 million, which grants Sound Transit permanent access to the S Line corridor, as well as allowing four more daily round trips to begin, starting in 2012 and continuing through 2016.[47]

On October 8, 2012, the extension to South Tacoma and Lakewood stations was inaugurated, with five daily round trips, all of which are in the peak direction, serving the new stations.[48] In September 2016, a mid-day round trip was added between Lakewood and Seattle.[49] In September 2017, two additional round trips were added, bringing the total to eight daily round trips servicing the Lakewood extension.[50][46]

N Line

[edit]

In May 2003, Sound Transit agreed to a $250 million lease arrangement with BNSF to use its Everett-to-Seattle tracks for 100 years. On December 17, 2003, the Sound Transit board approved a modified agreement that gave it a perpetual right to use the Everett-Seattle tracks for $258 million.[51]

The 35-mile (56 km) Everett-to-Seattle N line (formerly North Line) started with a Seahawks game train on December 21, 2003. Regular service started on December 22 with one morning train to Seattle and one evening train back. A second round trip train was added on June 6, 2005, to help increase ridership, a third was added in September 2007. In September 2008, an additional train was added to the line, bringing the total number to four round trips in the peak direction. On May 31, 2008, service to Mukilteo station began. There are currently three stops along the N Line: Edmonds, Mukilteo, and Everett.[52][53]

Trains on the N Line were prone to frequent cancellation due to mudslides throughout its history,[54] until a WSDOT project in the 2010s to protect the tracks from unstable hills.[55]

Service and operations

[edit]

Sounder generally serves rush hour commuters and runs almost entirely on weekdays, with most trains traveling inbound to Seattle in the morning and outbound to the suburbs in the afternoon and evening.[56] Service is also suspended for major holidays and a reduced schedule is used for certain days before or after holidays.[1] Sound Transit also runs occasional weekend trains for special events at Lumen Field and T-Mobile Park in Seattle. These include home games for the Mariners, Seahawks, and Sounders, as well as large concerts.[57][58] Sounder trains also operate from Everett to Puyallup on select September weekends for the annual Washington State Fair.[1][59]

The N Line has four daily round trips that depart Everett from 6:15 a.m. to 7:45 a.m. and depart from Seattle from 4:05 p.m. to 5:41 p.m.; trains take 59 minutes to travel the full length of the line.[26] The S Line has thirteen daily round trips, of which three are reverse commute trips that travel outbound to the suburbs in the morning and inbound to Seattle in the afternoon.[28][60] The peak-direction trips have an approximate frequency of 20 minutes; eight of the ten peak-direction trips serve Lakewood and South Tacoma stations; the rest terminate at Tacoma Dome Station, which is 55 minutes from King Street Station in Seattle.[9][56] There is one mid-day trip that provides service between the rush hour schedules for the line, which is generally paused from 9 a.m. to 2:30 p.m.[26][56]

Fares

[edit]

Sounder operates using a proof-of-payment fare system and uses distance-based fares; adult fares range from $3.25 to $5.75.[61] Passengers are required to purchase a paper ticket, use a mobile ticket, or tap their ORCA card (and receive a valid permit to travel) before boarding trains. Sound Transit fare inspectors or police officers randomly board trains and check for valid proof-of-payment, issuing warnings or fines to passengers without valid proof-of-payment. Passengers using ORCA cards are charged the maximum fare from the station they are traveling from and are issued a permit to travel when they tap before boarding and, if necessary, receive a refund when they tap after boarding. Discounted fares are offered for seniors and the disabled, and low-income riders qualifying for the ORCA Lift program.[62] Passengers under the age of 19 ride for free.

In October 2004, Sound Transit and Amtrak introduced the RailPlus fare program.[63] It allows riders on the N Line corridor to pay Sounder fares on weekday Cascades trains serving Everett, Edmonds, and Seattle. The program is available only to riders who use monthly passes and does not apply on the Empire Builder; Cascades trains also do not serve Mukilteo station.[64] Sound Transit also accepts Amtrak tickets between the three stations as part of the program.[1]

During the COVID-19 pandemic in 2020, fare collection for all Sound Transit services was suspended from March 21 to June 1.[65] Fares on Link and Sounder were reintroduced on June 1 with a discounted rate of $2 for non-ORCA users on Sounder.[66] Normal fares were later reinstated.[citation needed] A reduced, flat fare of $1.50 for youth passengers and low-income households enrolled in the ORCA Lift program debuted in March 2021.[67]

Ridership

[edit]

Weekday ridership on the N Line was roughly 1,100 in 2010[68] and was about 1,561 in the first quarter of 2016.[69]

The average weekday ridership in 2010 on the S Line was 8,300, down 7% from 2009 due to continued low employment in Downtown Seattle. Since then the average ridership has increased and as of October 2015 stood at 14,500 per day.[70] In 2019, S Line ridership was 16,419 per day.[71]

Year Ridership YoY Diff. %
2004 955,298
2005 1,268,291 32.8%
2006 1,692,971 33.5%
2007 2,156,652 27.4%
2008 2,668,623 23.7%
2009 2,492,362 -6.6%
2010 2,364,290 -5.1%
2011 2,543,955 7.6%
2012 2,811,891 10.5%
2013 3,035,735 8%
2014 3,361,317 10.7%
2015 3,812,040 13.4%
2016 4,165,992 9.3%
2017[72] 4,438,374 6.5%
2018[73] 4,646,408 4.7%
2019[74] 4,616,656 -0.6%
2020[75] 1,274,219 -72.4%
2021[76] 711,720 -44.1%
2022[76] 1,140,908 60.3%
Data from Sound Transit[77]

Rolling stock

[edit]
Model Manufactured Road Numbers Number In Fleet Notes Image
Locomotives
EMD F59PHI 1999 901–904 4 All locomotives rebuilt with engines that meet the Tier 3 EPA standard to reduce emissions and provide fuel savings.[78]
2000 905–906 2
2001 907–911 5
MotivePower MP40PH-3C 2012 921–923 3 Upgraded to comply with the Tier 3 emissions standard
Cab Cars
Bombardier BiLevel cab car 1999 101–104 4
2000 105–111 7 112–118 sold to Caltrain.[79]
2003 301–307 7
2017 321–329 9
2022 330–332 3 [80]
Coaches
Bombardier BiLevel Coach 2000 201–213 13
2001 214–215 2
2002 216–218, 227–228, 231–240 15 219–226 & 229–230 sold to Caltrain.[79]
2003 401–410 10
2022 411-418 8
Sources (unless noted otherwise):[81][82]

Future expansion

[edit]
The future terminus of the S Line at DuPont station

Sound Transit plans to add additional S Line stations at Tillicum and DuPont. The track has already been constructed by Sound Transit with funding from WSDOT as part of the Point Defiance Bypass project. Funding for constructing the two stations was approved in the 2016 Sound Transit 3 ballot measure and is expected to cost $300 million. It was originally scheduled to open in 2036, but was delayed to 2045 due to a systemwide funding gap caused by increased planning costs.[83][84] The Tillicum station is planned to be located near the intersection of Interstate 5 and Berkeley Street Southwest, adjacent to Joint Base Lewis–McChord. The terminus at DuPont station is planned to be located adjacent to an existing park and ride lot at Interstate 5 and Center Drive.[85]

In addition, Sound Transit plans to extend station platform lengths on the S Line to accommodate trains up to ten cars in length, up from the current seven, and increase service.[86] Both programs were included in the Sound Transit 3 ballot measure and were originally scheduled to be fully completed by 2036, but were also delayed by the systemwide funding gap and subsequent realignment of projects. Platform extensions are scheduled to be complete by 2036, while additional trips on the S Line are scheduled to be implemented by 2046.[87][88]

See also

[edit]

References

[edit]
  1. ^ a b c d e f g h i j k l "Sound Transit Transit Development Plan 2024–2029" (PDF). Sound Transit. August 22, 2024. pp. 9, 24–25. Retrieved January 2, 2025.
  2. ^ a b McGonigal, Robert S. (February 5, 2024). "Railroad reporting marks 101". Trains. Retrieved January 4, 2025.
  3. ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
  4. ^ "Transit Ridership Report Third Quarter 2024" (PDF). American Public Transportation Association. November 20, 2024. Retrieved November 23, 2024.
  5. ^ a b c "Sounder commuter rail" (PDF). Sound Transit. 2014. Retrieved January 2, 2025 – via Washington State Department of Transportation.
  6. ^ "Public Transportation Ridership Report, Fourth Quarter 2023" (PDF). American Public Transportation Association. July 2, 2024. pp. 5–6. Retrieved January 2, 2025.
  7. ^ Ruud, Candice (August 31, 2017). "Sound Transit will add two new Sounder trains between Seattle and Lakewood". The News Tribune. Retrieved January 2, 2025.
  8. ^ Ramachandra, Sagar (March 1, 2023). "Weekend Sounder trains: not just for sports fans". The Platform. Sound Transit. Retrieved January 2, 2025.
  9. ^ a b c d e f g h "Sounder South Strategic Development & Implementation Plan" (PDF). Sound Transit. April 2020. pp. 4–8, 28–29. Retrieved January 2, 2025.
  10. ^ Mayock, Melanie (April 17, 2019). "System Expansion Spotlight: Sounder South". Sound Transit. Retrieved January 2, 2025.
  11. ^ "Sound Transit Motion No. M2019-117" (PDF). Sound Transit. December 2019. Retrieved January 2, 2025.
  12. ^ a b "Fare Revenue Report 2023" (PDF). Sound Transit. August 2024. pp. 9–13, 19–22. Retrieved January 2, 2025.
  13. ^ a b c d e "Chapter 4: Operations Analysis". Service Development Plan for the Pacific Northwest Rail Corridor Update, Final Update (PDF) (Report). Washington State Department of Transportation. September 2017. pp. 3–5, 8–12, 41–42. Retrieved January 2, 2025 – via All Aboard Washington.
  14. ^ Mapes, Lynda V. (December 10, 2011). "Tunnels: Seattle's boring past filled with thrills". The Seattle Times. Retrieved January 2, 2025.
  15. ^ Fields, David (June 29, 2017). "MarketFront sits just inches above an active train tunnel: Here's how". Seattle Daily Journal of Commerce. Retrieved January 2, 2025.
  16. ^ a b c d e f g h i "Chapter Four: Existing Conditions". Pacific Northwest Rail Corridor Washington Segment – Columbia River to the Canadian Border: Program Environmental Assessment (PDF) (Report). Washington State Department of Transportation. September 2009. pp. 56–57. Archived from the original (PDF) on October 19, 2017. Retrieved January 2, 2025.
  17. ^ Winters, Chris (July 14, 2015). "BNSF treats employees' families to ride in vintage coaches". The Everett Herald. Retrieved January 2, 2025.
  18. ^ Banel, Feliks (October 10, 2018). "End of the line for Seattle's Salmon Bay Railroad Bridge?". KIRO Radio. Retrieved January 2, 2025.
  19. ^ a b "There's no summer vacation for safety". Sound Transit. July 17, 2015. Retrieved January 2, 2025.
  20. ^ Lindblom, Mike (September 5, 2013). "Project aimed to stop landslides on rail tracks north of Seattle". The Seattle Times. Archived from the original on August 12, 2014. Retrieved January 2, 2025.
  21. ^ Sheets, Bill (July 13, 2011). "Nicer stop for commuters". The Everett Herald. Retrieved January 2, 2025.
  22. ^ a b "Sounder Stations Access Study" (PDF). Sound Transit. September 2012. pp. 5, 12–13, 21–23, 28–29, 36–44, 51–52, 55–56. Retrieved January 2, 2025.
  23. ^ a b Salyer, Sharon (June 26, 2016). "Which track? Sounder passengers no longer have to guess". The Everett Herald. Retrieved January 2, 2025.
  24. ^ a b Sheets, Bill (October 14, 2012). "Buses a better deal than Sounder trains, panel says". The Everett Herald. Retrieved January 2, 2025.
  25. ^ "Bayside and railroad history". The Seattle Times. July 4, 2007. Retrieved January 2, 2025.
  26. ^ a b c "Sounder N&S Line schedules" (PDF). Sound Transit. September 2024. Retrieved January 2, 2025.
  27. ^ Velush, Lukas (December 17, 2003). "Sounder to finally get going". The Everett Herald. Retrieved January 4, 2025.
  28. ^ a b Relente, Angelica (October 23, 2023). "Weekend and evening Sounder trains? Sound Transit wants to know if you're interested". Puyallup Herald. Retrieved January 2, 2025.
  29. ^ Newcomb, Tim (May 30, 2014). "Ballpark Quirks: Safeco Field has its very own umbrella for rainy Seattle". Sports Illustrated. Retrieved January 2, 2025.
  30. ^ Lindblom, Mike (June 20, 2023). "Amtrak's Seattle maintenance-base plans would take over a Sodo street". The Seattle Times. Retrieved January 2, 2025.
  31. ^ a b c d e Washington State Department of Transportation (2014). Washington State Highways, 2014–2015 (PDF) (Map). 1:842,000. Olympia: Washington State Department of Transportation. Puget Sound inset. Retrieved January 2, 2025.
  32. ^ Seattle Harbor Map & Trucker's Guide, 2021–2022 (PDF) (Map). Northwest Seaport Alliance. August 2021. Retrieved January 2, 2025.
  33. ^ "Boeing Access Road Station fact sheet" (PDF). Sound Transit. April 2024. Retrieved January 2, 2025.
  34. ^ "New pedestrian bridge touches down in Tukwila". Seattle Daily Journal of Commerce. July 21, 2017. Retrieved January 2, 2025.
  35. ^ Hunter, Steve (January 25, 2023). "18 pedestrians in Kent killed by trains from 2019 to 2022". Kent Reporter. Retrieved January 2, 2025.
  36. ^ City of Puyallup (Map). City of Puyallup. August 24, 2016. Retrieved January 2, 2025.
  37. ^ Caldbick, John (January 7, 2015). "Milwaukee Road's S-Curve Trestle (Tacoma)". HistoryLink. Retrieved January 2, 2025.
  38. ^ Crawford, Galen (February 8, 2017). "Sound Transit replaces wooden train bridge over former Tacoma tidelands". The Platform. Sound Transit. Retrieved January 2, 2025.
  39. ^ Carson, Rob (November 9, 2012). "Train loses traction, about 100 passengers affected". The News Tribune. p. A1. Retrieved January 2, 2025 – via Newspapers.com.
  40. ^ Johnson, Shea (March 29, 2024). "Woman rode train home to Puyallup but didn't get off. What happened aboard the Sounder?". The News Tribune. Retrieved January 2, 2025.
  41. ^ "Regional Transit Long-Range Plan Update: Final Supplemental Environmental Impact Statement" (PDF). Sound Transit. November 2014. p. 2-4. Retrieved January 4, 2025.
  42. ^ a b "Guide to art: Sounder commuter rail" (PDF). Sound Transit. 2016. Retrieved January 4, 2025.
  43. ^ a b "Sounder train stations". Sound Transit. Retrieved January 4, 2025.
  44. ^ a b "Washington State Rail Plan 2019–2040" (PDF). Washington State Department of Transportation. August 2020. pp. 69–70. Retrieved January 4, 2025.
  45. ^ "Bringing your bike". Sound Transit. Retrieved January 4, 2025.
  46. ^ a b "Sound Transit: Sounder Commuter Rail Schedules". Sound Transit. Retrieved April 6, 2017.
  47. ^ "Sound Transit inks BNSF pact to add Sounder trains, picks preferred East Link route alternative". Progressive Railroading magazine. July 26, 2010. Retrieved December 23, 2023.
  48. ^ Hall, C.B. (November 21, 2012). "Sounder train gets a lackluster start in Lakewood". Crosscut. Retrieved May 2, 2017.
  49. ^ "South Sounder line to start mid-day service in September". Seattle Times. August 30, 2016. Retrieved April 6, 2017.
  50. ^ "Sounder south gets better than ever with new trips starting 9/25". Sound Transit. August 24, 2017. Archived from the original on June 12, 2018. Retrieved December 8, 2017.
  51. ^ Velush, Lukas (December 17, 2003). "Sounder to finally get going". Everett Herald. Retrieved December 24, 2023.
  52. ^ Pesznecker, Scott (May 31, 2008). "Sounder begins service to Mukilteo today". The Everett Herald. Retrieved May 31, 2008.
  53. ^ "Mukilteo Station". Sound Transit. February 10, 2008. Archived from the original on February 7, 2008. Retrieved February 10, 2008.
  54. ^ "Mudslides continue to plague rail traffic north of Seattle". Archived from the original on May 30, 2016. Retrieved November 27, 2013.
  55. ^ "Work starts on landslide solutions for Pacific Northwest Rail Corridor".
  56. ^ a b c "Sounder South Strategic Plan Update: Community Engagement Summary" (PDF). Sound Transit. January 2024. pp. 2, 9. Retrieved January 4, 2025.
  57. ^ Brown, Andrea (July 18, 2024). "Hop a Sounder train from Everett, Mukilteo, Edmonds to Mariners games". The Everett Herald. Retrieved January 4, 2025.
  58. ^ "Event service". Sound Transit. Retrieved January 4, 2025.
  59. ^ McKenzie, Madeline (August 30, 2017). "New features add to fun at Washington State Fair in Puyallup". The Seattle Times. Retrieved January 4, 2025.
  60. ^ "Volume II Appendix C: Built Enviornment" (PDF). Lower Green River Corridor Flood Hazard Management Plan Draft Programmatic Environmental Impact Statement. King County Flood Control District. March 2023. p. 215. Retrieved January 4, 2025.
  61. ^ "Transit Development Plan 2022–2027 and 2021 Annual Report" (PDF). Sound Transit. August 25, 2022. pp. 12–14. Retrieved November 17, 2022.
  62. ^ "Sounder train fares". Sound Transit. Retrieved December 21, 2018.
  63. ^ "The New Math: Sound Transit + Amtrak Cascades = RailPlus" (Press release). Sound Transit. September 17, 2024. Retrieved January 4, 2025.
  64. ^ "Rail Plus program". Sound Transit. Retrieved January 4, 2025.
  65. ^ "Sound Transit to suspend fares on all transit modes until further notice" (Press release). Sound Transit. March 20, 2020. Retrieved June 11, 2020.
  66. ^ "Reduced fare options will accompany June 1 reintroduction of fares on Link and Sounder" (Press release). Sound Transit. May 18, 2020. Retrieved June 11, 2020.
  67. ^ "Lower Sounder fares take effect March 1" (Press release). Sound Transit. February 22, 2021. Retrieved January 4, 2025.
  68. ^ 2011 SIP, page 26 Archived August 10, 2011, at the Wayback Machine
  69. ^ "2016 Q1 Report" (PDF). Archived from the original (PDF) on April 20, 2018. Retrieved April 20, 2018.
  70. ^ "October 2015 Ridership Summary" (PDF). www.soundtransit.org. Archived from the original (PDF) on November 7, 2013. Retrieved November 27, 2013.
  71. ^ "Q4 2019 Service Delivery Quarterly Performance Report" (PDF). Sound Transit. February 27, 2020. Retrieved July 30, 2020.
  72. ^ "2017 Ridership".
  73. ^ "Sound Transit Operations - December 2018 Service Performance Report" (PDF). Archived from the original (PDF) on May 28, 2019.
  74. ^ https://www.apta.com/wp-content/uploads/2019-Q4-Ridership-APTA.pdf&ved=2ahUKEwivjujLs8bpAhXGr54KHfL8DH4QFjAEegQIBBAK&usg=AOvVaw2Uwd3rFLsZ9LeH_rk_7YT0 [dead link]
  75. ^ "Q4 2020 Service Delivery Quarterly Performance Report" (PDF). Sound Transit. February 25, 2021. Retrieved March 4, 2021.
  76. ^ a b "Ridership". System performance tracker. Sound Transit. Retrieved October 16, 2023.
  77. ^ "Quarterly Ridership Report archive". Sound Transit. Retrieved April 12, 2017.
  78. ^ "MOTION NO. M2016-123 Sounder Locomotive Overhaul Contract Amendment" (PDF). Sound Transit. December 15, 2016. Archived from the original (PDF) on February 26, 2017. Retrieved February 25, 2017.
  79. ^ a b "Sound Transit Motion No. M2001-72". Sound Transit. Archived from the original (PDF) on June 20, 2010.
  80. ^ "New Sounder Train Cars Arrive In Seattle". Seattle, WA Patch. August 22, 2022. Retrieved October 15, 2022.
  81. ^ "Draft 2015 Service Implementation Plan – Appendix B: Fleet Plans" (PDF). Sound Transit. p. 112. Archived from the original (PDF) on November 8, 2014. Retrieved November 8, 2014.
  82. ^ "Two new Sounder train cars arrive for Seattle-Lakewood line". August 23, 2022.
  83. ^ Lynn, Adam (March 24, 2016). "Several Pierce County projects in $50 billion Sound Transit plan". The News Tribune. Retrieved December 20, 2016.
  84. ^ Luczak, Marybeth (August 6, 2021). "Sound Transit Adopts 'Realignment' Plan". Railway Age. Retrieved August 15, 2021.
  85. ^ "Sounder Extension to DuPont" (PDF). Sound Transit. July 21, 2016. Retrieved January 5, 2018.
  86. ^ "South Sounder Capital Improvements Program" (PDF). Sound Transit. July 1, 2016. Retrieved April 6, 2017.
  87. ^ "Realigned Capital Program Pursuant to Sound Transit Board action of August 5, 2021" (PDF). Sound Transit. August 12, 2021. Retrieved August 15, 2021.
  88. ^ "Sounder South Capacity Expansion". Sound Transit. Retrieved August 15, 2021.
[edit]
KML is from Wikidata